PROVIDING QUALITY
INDUSTRY SERVICES
for over a decade

visit us

2427 Route 143
Kempton, PA 19529

our hours

Shop
Monday – Friday
7am to 4pm

we accept

Credit and Debit Card,
Cash, and Check.

let's get it
done right

contact us today

our service
to you

24-Hour Emergency Repair Services!

our-service-to-you

We have been providing quality service throughout the Lehigh Valley, Southeastern PA, and Eastern United States for years. As a fully licensed and insured company, we specialize in a wide variety of services such as; mobile welding and fabrication, shop fabrication, on-site mechanical services and installation, structural steel services, sanitary welding, and CAD/CAM design. View Our Services Here.

Whether you have a question, want to request our services, or have a comment or concern, we’d love to hear from you. Get in touch via phone, email, or our form, and we’ll get back to you as soon as possible.

GET IN TOUCH

Complex Angular Transition

Large Square to Round Transition

Walk Over Piping Platform

Container House Installed on Site and Windows, Doors, and all Framing Completed

Welding of a Stainless-Steel Stand on Site

Welding Out of the Previously Fit-up Hot Tap Flange

Fitment of a Hot Tap Flange

In Progress of the on-Site Welding of a Conveyor Walkway with Railings

In Progress Build of a Large Hopper and Transitions

Hard-facing of a Paddle

Mezzanine Extension during the Installation Process. Beams Fabricated Prior to Installation.

Structural Beams that were Fabricated and Painted in the Shop being Installed on Site

Metal Decking Being Welded Down before Concrete is Poured On Top

View from Underneath of Some Small Structural Beams and Bar Joists being Installed at a Local School Addition

Resident Structural Steel Fabricated in Place

Large and Complex Press Stand being Fabricated

Press Stand Fabricated and Painted in House

View from the Top of a Stair Platform after Installation

In Shop Progress of Hopper and Equipment Stand

Another View of the Manufacturing Line

Completed Manufacturing Line Fabricated and Installed. Machine Platforms Fabricated in the Shop and Walkways Fabricated on Site

Primed Structural Members Installed on Site with Custom Wood Roof Joist Mount Plates

Engraving Capabilities

1” Thick Mild Carbon Steel Cut Quality

1” Thick Mild Carbon Steel Cut Quality

1” Thick Mild Carbon Steel Cut Quality

1” Thick Mild Carbon Steel Cut Quality

Spiral Cut Out

Rendering of Trap Door Railing and Gas Shock Placement

24” Ductwork Routing Profile to See Any/All Obstacles and Cut Lengths

Rendering of Platform Addition

Side Wing Assembly

Mounting Plate

Color Coded Gutter Brush Assembly

Small but Complex Platform

Grain Auger

Seed Hopper Transition with Slide Stop

Fuel Tank Skid

Large Equipment Fender

Pump Cover for Hydraulic Steps

Seed Hopper Transition with Slide Stop

Haul Truck Platform Upgrade

½” Bent Parts for Safety Equipment Manufacturer

Display Stands for Drink Manufacturer

Pipe Railings for Local Plant

Small Batch of Laser Holders

Ornamental Railing Installed after being Fabricated in House

Bridge Crane Operators Station with Entrance Stairs after Installation. Everything Built and Painted in House

Underside of a Large Fender

Welding of the Base of a Large, Custom, Stainless Steel Water Tank

Underside of an Equipment Platform

Welding of an Aluminum Stand on Site

Seam Welding a Large Stainless Steel Water Tank being Built in the Shop

Welding of a Hot Tap on Another Water Main

Bar Grate Equipment Walk Around

Display Stands prior to Shipment to England

Hopper and Equipment Platform

Welding a Hot Tap Flange onto a 72” Water Main for one of the Nearby Cities

Overhead Reducer Down to a Filler

Multi-level Pipe Run

90 Degree Elbow with a 45

Custom drain for a filling unit

3” reduced down to 2” pipe run

Completed Piping Run

Completed and Cleaned Sanitary Weld

Completed Sanitary Piping Run with Pipe Stands to a Switchover for a Brewery. Pipes include Beer, CIP, Bottled Beer, and Canned Beer.

Finished Sanitary Weld Prior to Cleaning and Passivation

Tacked up Reducer Ready to be Purged and Welded

Welding Out a Piece of Sanitary Piping Before Installation

Welding Out a Piece of Sanitary Piping Before Installation