Knowledge and safety are two of the most important factors when providing welding services and in metalworking as a whole. UMI is proud to be fully licensed and insured with certified welders and a welding engineer on staff. Our  staff is trained and equipped to TIG, MIG, or stick weld all ferrous and non-ferrous alloys.


Alloys including, but not limited to:
Mild Carbon Steel, Aluminum, Stainless Steel, Hastelloy, and Titanium.

Metal Fabricating and Machining

We have a cutting edge CNC metalworking department fully equipped with the best tools and software available Our experienced personnel and vast array of equipment will help us make whatever you need for your job, from the very best materials. 

We have Laser Cutting for plate and pipe, CNC Press Brakes, Automatic CNC Sawing, and CNC Tube Bending Machines, amongst others.

let's get it
done right

contact us today

view our industrial capabilties

fabrication

industrial
millwright

Hard-facing of a Paddle

In Progress Build of a Large Hopper and Transitions

Welding a Hot Tap Flange onto a 72” Water Main for one of the Nearby Cities

In Progress of the on-Site Welding of a Conveyor Walkway with Railings

Welding of a Hot Tap on Another Water Main

Fitment of a Hot Tap Flange

Seam Welding a Large Stainless Steel Water Tank being Built in the Shop

Welding of an Aluminum Stand on Site

Welding of a Stainless-Steel Stand on Site

Container House Installed on Site and Windows, Doors, and all Framing Completed

Hopper and Equipment Platform

Display Stands prior to Shipment to England

Bar Grate Equipment Walk Around

Walk Over Piping Platform

Large Square to Round Transition

Complex Angular Transition

Underside of an Equipment Platform

Welding of the Base of a Large, Custom, Stainless Steel Water Tank

Underside of a Large Fender

Bridge Crane Operators Station with Entrance Stairs after Installation. Everything Built and Painted in House

Ornamental Railing Installed after being Fabricated in House

Welding Out of the Previously Fit-up Hot Tap Flange

Mezzanine Extension during the Installation Process. Beams Fabricated Prior to Installation.

Structural Beams that were Fabricated and Painted in the Shop being Installed on Site

Metal Decking Being Welded Down before Concrete is Poured On Top

View from Underneath of Some Small Structural Beams and Bar Joists being Installed at a Local School Addition

Resident Structural Steel Fabricated in Place

Large and Complex Press Stand being Fabricated

Press Stand Fabricated and Painted in House

View from the Top of a Stair Platform after Installation

In Shop Progress of Hopper and Equipment Stand

Another View of the Manufacturing Line

Completed Manufacturing Line Fabricated and Installed. Machine Platforms Fabricated in the Shop and Walkways Fabricated on Site

Primed Structural Members Installed on Site with Custom Wood Roof Joist Mount Plates

Engraving Capabilities

1” Thick Mild Carbon Steel Cut Quality

1” Thick Mild Carbon Steel Cut Quality

1” Thick Mild Carbon Steel Cut Quality

1” Thick Mild Carbon Steel Cut Quality

Spiral Cut Out

Rendering of Trap Door Railing and Gas Shock Placement

24” Ductwork Routing Profile to See Any/All Obstacles and Cut Lengths

Rendering of Platform Addition

Side Wing Assembly

Mounting Plate

Color Coded Gutter Brush Assembly

Small but Complex Platform

Grain Auger

Seed Hopper Transition with Slide Stop

Fuel Tank Skid

Large Equipment Fender

Pump Cover for Hydraulic Steps

Seed Hopper Transition with Slide Stop

Haul Truck Platform Upgrade

½” Bent Parts for Safety Equipment Manufacturer

Display Stands for Drink Manufacturer

Pipe Railings for Local Plant

Small Batch of Laser Holders

Overhead Reducer Down to a Filler

Multi-level Pipe Run

90 Degree Elbow with a 45

Custom drain for a filling unit

3” reduced down to 2” pipe run

Completed Piping Run

Completed and Cleaned Sanitary Weld

Completed Sanitary Piping Run with Pipe Stands to a Switchover for a Brewery. Pipes include Beer, CIP, Bottled Beer, and Canned Beer.

Finished Sanitary Weld Prior to Cleaning and Passivation

Tacked up Reducer Ready to be Purged and Welded

Welding Out a Piece of Sanitary Piping Before Installation

Welding Out a Piece of Sanitary Piping Before Installation